Raising the Walls



This week the gym will really begin to take shape as the steel walls will be raised. All the steel has been delivered and will be put together. Pray for good weather and also safety for those working on the building.

Pastor Parrish shares in a recent email...

The construction company is laying out plans for the steel to begin setting tomorrow (Tuesday) and the 6 Inch water line is going in today with the electrician placing the line for the Sprinkler Fire alarm in it's ditch also. They had to set a vault 7 feet deep that is 5 feet by 7 feet with a back flow valve then the 6 inch pipe and Fire hydrant and each place there is a 90 degree elbow they much back it with concrete so the concrete truck will be here shortly. It is a pretty muddy job right now after the rain we got over the weekend.