Here is the finished and striped parking lot on the right side of the gym.
As soon as the electrical lines are run painting can continue. With lights being accessible.
As our Church begins a new building phase, this blog will keep you up to date with the progress.
This is a close up to show the detail of the building. It is brick a quarter of the way up and Effice painted a tan color the rest of the way. Each window has a decorative feature above it.
Here is a video showing the inside. Some parts may be to dark. It was to dark to show the gym portion of the building that is straight back after going through the front door.
There is no sound.
As you walk through the front door there is a large foyer with four classrooms, two on each side. Then next is a storage room on one side and a kitchen on the other side. Inside the gym is access to the bathrooms (not pictured).
On Monday...